
Maccaferri Indonesia described slope protection work on the Wellpad E access road at the Muara Laboh geothermal project, where steep terrain presented landslide and erosion risks. The project covered approximately 980 square metres.
The proposed system combined a reinforced-soil retaining structure with surface erosion-control measures and vegetation. Original Maccaferri project case study.
From the IBAI archive. Published 1 Dec 2022. This historical report reflects information available at the time.
Browse member stories